Talk to our Team Now 604-962-8836 connect@tmbuilders.ca

NEW HOME CONSTRUCTION

You Dream It, We Build It

Lakefront Lodge

An 18,000 board-foot glulam timber package designed in 3D and pre-cut in Squamish, this precision beam package was constructed over 4 days with a 40-ton crane. Geothermal heating and cooling heating systems supply radiant in-floor heat throughout the house with combined forced air for supplemental heating and cooling. This system reduces the energy consumption required for heating and cooling by 5x conventional electric heat. The home has 4 fireplaces with a custom-built Rumford fireplace in the Great Room. Basalt stonework was hand-picked from a local quarry with some pieces weighing over 1800 lbs. An elevator plus a dumb waiter for bringing firewood from outside to the upstairs Rumford fireplace are just one of the many other unique building features.

Pin It on Pinterest